Back to Challenge
Bridge Repairs – Cameron Overpass over Duke Street
infrastructure
Hard
400 points
Perform structural repairs and maintenance on the Cameron Station pedestrian overpass bridge over Duke Street. Work includes concrete surface repairs, sealing of expansion joints, resetting or replacing existing bearing plates, replacing a damaged anchor bolt, and repairing spalled or delaminated concrete on piers, abutments, and wing walls.
Deadline
March 4, 2025
Potential Savings
$275,000
Location
Cameron Station Overpass
Points
400